Waste heat recovery boiler: 1400 kg/h (per unit). Toptal 3x1400 kg/h = 4200 kg/h
Operation Pressure: 6 barg
Hot water capacity (at Δt20
ºC'): 40.000x3=120.000 kg/h
Transformers 1 piece 630 kVA internal consumption transformer
(AREVA, type: DCU
3836)
3 sets of 2500 kVA (6300 V/ 34,5 kV) step-up transformer (AREVA,DCU
4436
type)
Main stacks,
Complete cooling system,
Air start compressor (although the units are designed to be air started, it was changed to electrical start lately.)
Complete MV system (MERLIN GERIN)